|
|
|
|
|
|
|
|
|
|
|
|
|
![]() |
December 19, 2004
|
![]() |
![]() Lots of activity at the depot. ![]() Bill engineers his UP train through the depot area. ![]() Dale at the controls of a Majestic loco. ![]() Steam and diesel at the steaming bays. ![]() A sleeper car... ![]() Harry engineers the PCRy No. 2 with a full passenger load. ![]() A PCRy lumber flat out on the mainline. ![]() A couple work flats with ties for the new steel rail. |
![]() Laying the new steel rail has now made it all the way around from the car barn to the yard area proper. ![]() Installation of the steel rail is also bringing the rail level up several inches to eliminate the "yard dip". ![]() Forms are being put in place to pour the foundation of a carbarn at the turntable up in the Mountain Division. ![]() No. 4409 awaits at the steaming bay. ![]() This mixed consist moves on down the mainline. ![]() BNSF No. 2001 crosses a bridge. Previous Work Day... | More... |