|
|
|
|
|
|
|
|
|
|
|
|
|
![]() |
July 16, 2005
|
![]() |
![]() Tearing out the old track. ![]() The new steel track was built right on top of the old track which makes a good "work table". The new track is then scooted off to the side and the old track is removed and the path dug out a little more to accommodate the deeper 2x4 ties. About 120 feet of track was layed today through and on both sides of Tunnel #4. ![]() ![]() Harry took on tree-trimming duty today. ![]() ![]() Karl sets up the laser transit. |
![]() Karl and Kevin bend some rail in preparation for track laying. ![]() The laser transit is a very handy tool for proper grading. ![]() Bob is creating a nice area by the steps to the BBQ. He's installing a crossing gate here! ![]() ![]()
|