|
|
|
|
|
|
|
|
|
|
|
|
|
![]() |
September 17, 2005
|
![]() |
September 17a, 17b, 17c, 18![]() A close-up on the Berkshire. ![]() No. 756. ![]() Another shot inside the cab. ![]() Dale really did enjoy this way too much! ![]() A revenue train of logs. September 17a, 17b, 17c, 18 |
![]() Sol was batting clean-up at this point. ![]() Unloading the SMVRR log train. ![]() The now-empty train pulled by SMVRR No. 1801 leaves the yard area. ![]() Karl engineering the PCRy No. 120. ![]() Jack (builder) at the controls of the Berkshire as Peter (owner) looks on. Visit Jack's web site for more info on the Berkshire's construction. ![]() ![]() There for a while, everyone was blocked in by tree trimming debris. |