|
|
|
|
|
|
|
|
|
|
|
|
|
![]() |
May 20, 2006
|
![]() |
![]() First, new ties are lined up on top of the rail that is being replaced. ![]() A 20-foot length of steel rail is cut in half so as to offset the rail joins on the finished track. ![]() Bob worked the signal control at the base of the stairs up to the BBQ. ![]() Bill does the fence-painting shuffle. ![]() Hot dogs for lunch! ![]() ![]() Karl and Bill discuss some finer points. ![]() Screws hold the rails to the ties. ![]() It's running on air! ![]() 140 feet of track is done! Another day, the old track (left) will be pulled out and the new put in. |
![]() John digs postholes for extending the two right carbarn tracks. ![]() Bob and Thys help line things up. ![]() ![]() A 3-man rail team works well. ![]() Signalmen. ![]() Dennis is pulling his new Pleasant Valley No. 11 around to the yard using the X-1. ![]() ![]() Jack was putting new bottoms in some brake wheel planters. ![]() The posthole shuffle.
|