|
|
|
|
|
|
|
|
|
|
|
|
|
![]() |
December 16, 2006
|
![]() |
![]() BCWRR is the first railroad to install this Roll Models switch control and signal. ![]() Basic leaf and needle cleanup.
|
Karl told us today that a picture from Will's Make-a-Wish trip to the BCWRR (web story) is the September picture in the Make-a-Wish Foundation's 2007 calendar. See the story page on this site.![]() The ballast should go out 2 inches from the edge of the tie, and then slope down. ![]() ![]() (
|