|
|
|
|
|
|
|
|
|
|
|
|
|
![]() |
Historical Photos |
![]() |

![]() Some of the BCWRR crew in February of 1983. ![]() April 1985. ![]() The cuts are made for the track. May 1985. ![]() 1985. ![]() December 1985. This chronology appears in the photo album from which these images were scanned: Fall, 1983 - Talk, plans, talk, plans, talk, plans, etc. 2/6/84 - Best plan with reasonable grades; simplified loops, cuts, and fills. 2/26/84 - First stakes of track plan put in with tape measure only. 3/10/84 - Restaked loops 50' more uphill to decrease amount of lower fills. 3/25/84 - Argued and restaked entire line, even upper loop. Unloaded 22 sections of track panels. 4/1/84 - Offset stakes put in, some with tall extensions for deep fills. 6/23/84 - Doug starts cuts and big fill with dozer. 7/1/84 - Most of lower fill done. Upper fill started. 10/28/84 - Lower fill enlarged for double track. Upper fill completed. 12/2/84 - Oversized ballast rock reloaded from upper gate to lower layout. 12/8/84 - More dirt taken out on lower fill; transit readings varying. 1/20/85 - Side-rod diesel, Eula, and 4 cars arrive. Also, first Christmas trees planted. Track panels almost halfway around first loop. 1/30/85 - "San Luis Southern" chosen as name of club by Doug, John, Karl, Everett, Gene, Iran, Dave, and Pete while at lunch at Bob's in SLO. 2/3/85 - Planted 18 small pine trees. Hand carry all water. |
![]() Some of the mainline is in place. January 1985. ![]() May 1985. ![]() A tunnel is underway. October 1985. ![]() The first of the locomotives to ride the BCWRR rails - No. 3004. December 1985. ![]() This is the car barn area of today as it looked in December of 1985. 2/8/85 - Loaded five pickup trucks with wet gravel granite at SLO. 2/9/85 - Dumped gravel at layout. Completed last 50' of first loop. Ran Eula. Big ice plant planted on North side of big fill. Harry Haas and Jim Jury visit. 2/10/85 - Cut over 1000 railroad ties at Jack's house, then Karl put in the first switch. 3/3/85 - Doug attempted to teach Eula to fly. She tried hard. 4/13/85 - Flowering ice plant and more trees planted, watered by hand sprayer and temp sprinkler lines from upper loop. 5/18/85 - Underground water lines installed, feeder lines added later. 11/3/85 - Jack planted 47 cedar trees. Tunnel frames being mass produced. 12/1/85 - First 24' tunnel done with dirt added on top. On to 1986... |